
London Electrical Solutions Ltd
Vehicle Charging. London Electrical Solutions Ltd has been vetted and approved by TrustATrader. Covering the Whole of London within the M25 and South East England
Membership number TT16737
Don't forget! Please mention TrustATrader when you contact any of our trusted traders.
All TrustATrader members are checked and vetted!
About London Electrical Solutions Ltd, London, SE10 9QF
Finding an electrician in London that covers electric vehicle charging can be a minefield. Although becoming more available, it is still difficult to know who to choose.
London Electrical Solutions Ltd can now cover all your requirements, and is a friendly and reliable electrical company who consider no job as too big or too small. Based in London, our team of qualified, professional electricians have over 100 years of combined experience in the industry. We consistently offer value and quality to commercial and domestic customers and pride ourselves on the positive feedback that we get from our many satisfied customers.
You may need to find an electrician in a rush or may have a list of small electrical jobs that need carrying out. Whatever your requirements, we promise that we will be punctual, helpful and offer you optimal value for money.
We are fully insured and qualified and are registered with the following professional bodies:
NICEIC
Alcumus
Constructionline
We offer a range of electrical services in London and the surrounding area including:
- Electric Vehicle Charging
- Full & Part Rewires
- New Builds
- Lighting
- Switchboards
- Bathroom & Kitchen Extractors
- Electric Showers
- Additional Plug Sockets
- Test Certificates
- All Electrical Testing
- Fire Alarms
- Interior & Exterior Inspection & Reporting (EICR)
- Garage Electrics
- External Power
- Garden Sockets
- Security Systems
- Security Lighting
- Emergency Lighting
- Garden Lighting
- Emergency Call Outs
To check the availability of our electricians or for information and advice about the services we offer, please call and speak to one of our friendly advisors who will be happy to offer you a free, no-obligation quote.
Alternatively, to find out more about London Electrical Solutions Ltd and the services we offer, click on the following link to visit our website
Please mention Trustatrader when calling.
Photo gallery
-
Image
1
- New under cabinet Lighting installed
-
Image
2
- New under cabinet Lighting installed
-
Image
3
-
Image
4
- Bollard Lighting installation local to Westminster Bridge
-
Image
5
- Bollard Lighting installation local to Westminster Bridge
-
Image
6
- Bollard Lighting installation local to Westminster Bridge
-
Image
7
- Bollard Lighting installation local to Westminster Bridge
-
Image
8
- Bollard Lighting installation local to Westminster Bridge
-
Image
9
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
10
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
11
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
12
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
13
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
14
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
15
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
16
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
17
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
18
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
19
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
20
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
21
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
22
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
23
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
24
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
25
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
26
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
27
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
28
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
29
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
30
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
31
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
32
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
33
- Thames Water - assorted works during 1st and 2nd fix of new Power supplies, electrical cabinets, Distribution boards, Tray work etc
-
Image
34
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
35
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
36
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
37
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
38
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
39
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
40
- Taxi Graphic Company, installation of new electrical basket, new power supplies along with suspended sockets that are retractable.
-
Image
41
- Under floor heating and new recessed spot lighting installation
-
Image
42
- Under floor heating and new recessed spot lighting installation
-
Image
43
- Under floor heating and new recessed spot lighting installation
-
Image
44
- Under floor heating and new recessed spot lighting installation
-
Image
45
- Under floor heating and new recessed spot lighting installation
-
Image
46
- Under floor heating and new recessed spot lighting installation
-
Image
47
- Under floor heating and new recessed spot lighting installation
-
Image
48
- East London Barber Shop Lighting installation
-
Image
49
- Kitchen Lighting
-
Image
50
- Railway Arch office lighting installation
-
Image
51
- Railway Arch office lighting installation
-
Image
52
-
Image
53
- Railway Arch office lighting installation
-
Image
54
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
55
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
56
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
57
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
58
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
59
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
60
- Pub garden works, New power installation for Retractable awnings with external heaters, New Distribution board with isolators etc
-
Image
61
- Store room Lighting with PIR sensor
-
Image
62
- Store room Lighting with PIR sensor
-
Image
63
- Phone Shop lighting
-
Image
64
- Phone Shop Repairs desk Dado trunking installation with new sockets, USB sockets, Data outlets
-
Image
65
- Phone Shop Repairs desk Dado trunking installation with new sockets, USB sockets, Data outlets
-
Image
66
- Phone Shop Repairs desk Dado trunking installation with new sockets, USB sockets, Data outlets
-
Image
67
- Phone Shop Repairs desk Dado trunking installation with new sockets, USB sockets, Data outlets
-
Image
68
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
69
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
70
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
71
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
72
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
73
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
74
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
75
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
76
- Office Refurb, Lighting installation, Distribution board installs and sockets etc
-
Image
77
- Office Meeting Room Lighting installation
-
Image
78
- Office Meeting Room Lighting installation
-
Image
79
- Soho Office 1st fix works and some second fix works in progress
-
Image
80
- Soho Office 1st fix works and some second fix works in progress
-
Image
81
- Soho Office 1st fix works and some second fix works in progress
-
Image
82
- Soho Office 1st fix works and some second fix works in progress
-
Image
83
- Soho Office 1st fix works and some second fix works in progress
-
Image
84
- Soho Office 1st fix works and some second fix works in progress
-
Image
85
- Soho Office 1st fix works and some second fix works in progress
-
Image
86
- Soho Office 1st fix works and some second fix works in progress
-
Image
87
- Soho Office 1st fix works and some second fix works in progress
-
Image
88
- Office Dado trunking with New sockets, Data installed
-
Image
89
- Office Dado trunking with New sockets, Data installed
-
Image
90
- Office Dado trunking with New sockets, Data installed
-
Image
91
- Office Dado trunking with New sockets, Data installed
-
Image
92
- Office Dado trunking with New sockets, Data installed
-
Image
93
-
Image
94
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
95
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
96
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
97
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
98
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
99
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
100
- London City Media Office, new power and data installation, floor sockets, wall sockets etc
-
Image
101
- Pendant lighting Replacement throughout
-
Image
102
- Pendant lighting Replacement throughout
-
Image
103
- Pendant lighting Replacement throughout
-
Image
104
- Pendant lighting Replacement throughout
-
Image
105
- Pendant lighting Replacement throughout
-
Image
106
- Leisure Centre Lighting upgrade around the pool areas
-
Image
107
- Leisure Centre Lighting upgrade around the pool areas
-
Image
108
- Leisure Centre Lighting upgrade around the pool areas
-
Image
109
- Leisure Centre Lighting upgrade around the pool areas
-
Image
110
- Leisure Centre Lighting upgrade around the pool areas
-
Image
111
- Kitchen Power Track Installation, Recessed power track where you can put your sockets where you need them them most
-
Image
112
- Kitchen Power Track Installation, Recessed power track where you can put your sockets where you need them them most
-
Image
113
- Kitchen Power Track Installation, Recessed power track where you can put your sockets where you need them them most
-
Image
114
- Kitchen Power Track Installation, Recessed power track where you can put your sockets where you need them them most
-
Image
115
- Kitchen Power Track Installation, Recessed power track where you can put your sockets where you need them them most
-
Image
116
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
117
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
118
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
119
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
120
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
121
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
122
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
123
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
124
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
125
- House Rewire after images, stairwell led lighting, Data, Sockets, Audio, Lighting etc
-
Image
126
- Lighting Upgrade and replacement for a Domestic property. New track lighting, spot lights and other works
-
Image
127
- Lighting Upgrade and replacement for a Domestic property. New track lighting, spot lights and other works
-
Image
128
- Lighting Upgrade and replacement for a Domestic property. New track lighting, spot lights and other works
-
Image
129
- Lighting Upgrade and replacement for a Domestic property. New track lighting, spot lights and other works
-
Image
130
- Lighting Upgrade and replacement for a Domestic property. New track lighting, spot lights and other works
-
Image
131
- Lighting Upgrade and replacement for a Domestic property. New track lighting, spot lights and other works
-
Image
132
- Flatmaster 2000 installation in approx 8 properties that were all suffering from black mould, Positive input ventilation reduced and pretty much eliminated majority if not all Black mould in all the properties over a period of 3-6 weeks
-
Image
133
- Flatmaster 2000 installation in approx 8 properties that were all suffering from black mould, Positive input ventilation reduced and pretty much eliminated majority if not all Black mould in all the properties over a period of 3-6 weeks
-
Image
134
- Flatmaster 2000 installation in approx 8 properties that were all suffering from black mould, Positive input ventilation reduced and pretty much eliminated majority if not all Black mould in all the properties over a period of 3-6 weeks
-
Image
135
- Flatmaster 2000 installation in approx 8 properties that were all suffering from black mould, Positive input ventilation reduced and pretty much eliminated majority if not all Black mould in all the properties over a period of 3-6 weeks
-
Image
136
- Flatmaster 2000 installation in approx 8 properties that were all suffering from black mould, Positive input ventilation reduced and pretty much eliminated majority if not all Black mould in all the properties over a period of 3-6 weeks
-
Image
137
- EV Charger Installation
-
Image
138
- EV Charger Installation
-
Image
139
- EV Charger Installation
-
Image
140
- EV Charger Installation
-
Image
141
- External Weather Proof electrical enclosure replacement of Cabinet, DB and other parts, before and after
-
Image
142
- External Weather Proof electrical enclosure replacement of Cabinet, DB and other parts, before and after
-
Image
143
- External Weather Proof electrical enclosure replacement of Cabinet, DB and other parts, before and after
-
Image
144
- External Weather Proof electrical enclosure replacement of Cabinet, DB and other parts, before and after
-
Image
145
- External Weather Proof electrical enclosure replacement of Cabinet, DB and other parts, before and after
-
Image
146
- Educational Facility, installation of new Dado trunking, Sockets, Data outlets
-
Image
147
- Educational Facility, installation of new Dado trunking, Sockets, Data outlets
-
Image
148
- Educational Facility, installation of new Dado trunking, Sockets, Data outlets
-
Image
149
-
Image
150
- Educational Facility, installation of new Dado trunking, Sockets, Data outlets
-
Image
151
- Educational Facility, installation of new Dado trunking, Sockets, Data outlets
-
Image
152
- Domestic Property removal of pendant lighting and installation of new recessed spot lights
-
Image
153
- Domestic Property removal of pendant lighting and installation of new recessed spot lights
-
Image
154
- Domestic Property removal of pendant lighting and installation of new recessed spot lights
-
Image
155
- DB Upgrade before and after
-
Image
156
- DB Upgrade before and after
-
Image
157
- Dali Lighting installation for Domestic Property
-
Image
158
- Dali Lighting installation for Domestic Property
-
Image
159
- Dali Lighting installation for Domestic Property
-
Image
160
- Dali Lighting installation for Domestic Property
-
Image
161
- Dali Lighting installation for Domestic Property
-
Image
162
- Communal Garden Lighting installation / Upgrade
-
Image
163
- Communal Garden Lighting installation / Upgrade
-
Image
164
- Communal Garden Lighting installation / Upgrade
-
Image
165
- Communal Garden Lighting installation / Upgrade
-
Image
166
- Communal Garden Lighting installation / Upgrade
-
Image
167
- Communal Garden Lighting installation / Upgrade
-
Image
168
- Communal Garden Lighting installation / Upgrade
-
Image
169
- CCTV Installation for apartment Block
-
Image
170
- CCTV Installation for apartment Block
-
Image
171
- CCTV Installation for apartment Block
-
Image
172
- CCTV Installation for apartment Block
-
Image
173
- Car park Bollard Lighting
-
Image
174
- Car park Bollard Lighting
-
Image
175
- Car park Bollard Lighting
-
Image
176
- Restaurant Under counter Bar Lighting
-
Image
177
- Bathroom Lighting / False Ceiling and Fan installation
-
Image
178
- Bathroom Lighting / False Ceiling and Fan installation
-
Image
179
- Bathroom Lighting installation
-
Image
180
- Bathroom Lighting installation
-
Image
181
- Bathroom Lighting installation
-
Image
182
- Clothing Lighting Display
-
Image
183
- Consumer unit upgrade on and off peak
-
Image
184
- Consumer unit upgrade on and off peak
-
Image
185
- Consumer unit upgrade on and off peak
-
Image
186
- Consumer unit upgrade on and off peak
-
Image
187
- DB Upgrade for domestic property
-
Image
188
- DB Upgrade for domestic property
-
Image
189
- Storage heater replacement
-
Image
190
- New electrical towel rail installed
-
Image
191
- Storage heater replacement
-
Image
192
- Coin Meter installation / Replacement
-
Image
193
- Coin Meter installation / replacement
-
Image
194
- DB Upgrade
-
Image
195
- DB Upgrade
-
Image
196
- AFDD Installation
-
Image
197
- AFDD Installation
-
Image
198
- Single Phase Consumer unit upgrade x2 with all RCBO's for every circuit
-
Image
199
- Single Phase Consumer unit upgrade x2 with all RCBO's for every circuit
-
Image
200
- Single Phase Consumer unit upgrade x2 with all RCBO's for every circuit
-
Image
201
- DB upgrade for a single phase supply
-
Image
202
- DB Upgrade labelling completed
-
Image
203
- Before / After of a replacement Hot water timer installed
-
Image
204
- Before / After of a replacement Hot water timer installed
-
Image
205
- New Vortice Extractor fans fitted
-
Image
206
- New Vortice Extractor fans fitted
-
Image
207
- Kitchen under cabinet lighting installed
-
Image
208
- Kitchen under cabinet lighting installed
-
Image
209
- Bathroom Under cabinet lighting installed
-
Image
210
- New under floor heating installed
-
Image
211
- Kitchen works
-
Image
212
- Emergency Lighting installed
-
Image
213
- Twin Consumer unit Upgrades
-
Image
214
- New Recessed LED Strip in a Flush plaster in Profile installed into the Kitchen Ceiling
-
Image
215
- New Recessed LED Strip in a Flush plaster in Profile installed into the Kitchen Ceiling
-
Image
216
- New Recessed LED Strip in a Flush plaster in Profile installed into the Kitchen Ceiling
-
Image
217
- Twin Consumer unit Upgrades
-
Image
218
- External sockets installed
-
Image
219
- Another Single Phase DB Upgraded
-
Image
220
- Another Single Phase DB Upgraded
-
Image
221
- Another Single Phase DB Upgraded
-
Image
222
- Consumer unit Upgrades for Single Phase Supplies
-
Image
223
- Consumer unit Upgrades for Single Phase Supplies
-
Image
224
- Consumer unit Upgrades for Single Phase Supplies
-
Image
225
- Consumer unit Upgrades for Single Phase Supplies
-
Image
226
- Consumer unit Upgrades for Single Phase Supplies
-
Image
227
- Consumer unit Upgrades for Single Phase Supplies
-
Image
228
- Installation of new Recessed spot lighting
-
Image
229
- Installation of new Recessed spot lighting
-
Image
230
- Installation of new Recessed spot lighting
-
Image
231
- Installation of new Recessed spot lighting
-
Image
232
- Installation of new Recessed spot lighting
-
Image
233
- Installation of a new Smart Home Rako system
-
Image
234
- Working alongside UKPN, Who installed a new 3 Phase Head for our client, We have install new containment, 3 phase Isolators, 3 Phase Distribution equipment and supplies ready for him so that he can get the rest of the works done on his Coffee Shop
-
Image
235
- Working alongside UKPN, Who installed a new 3 Phase Head for our client, We have install new containment, 3 phase Isolators, 3 Phase Distribution equipment and supplies ready for him so that he can get the rest of the works done on his Coffee Shop
-
Image
236
- Working alongside UKPN, Who installed a new 3 Phase Head for our client, We have install new containment, 3 phase Isolators, 3 Phase Distribution equipment and supplies ready for him so that he can get the rest of the works done on his Coffee Shop
-
Image
237
- Working alongside UKPN, Who installed a new 3 Phase Head for our client, We have install new containment, 3 phase Isolators, 3 Phase Distribution equipment and supplies ready for him so that he can get the rest of the works done on his Coffee Shop
-
Image
238
- Working alongside UKPN, Who installed a new 3 Phase Head for our client, We have install new containment, 3 phase Isolators, 3 Phase Distribution equipment and supplies ready for him so that he can get the rest of the works done on his Coffee Shop
-
Image
239
- Working alongside UKPN, Who installed a new 3 Phase Head for our client, We have install new containment, 3 phase Isolators, 3 Phase Distribution equipment and supplies ready for him so that he can get the rest of the works done on his Coffee Shop
-
Image
240
- Installation of a new Sevadis EV Charger with a new dedicated consumer unit and supply
-
Image
241
- Installation of a new Sevadis EV Charger with a new dedicated consumer unit and supply
-
Image
242
- Installation of a new Sevadis EV Charger with a new dedicated consumer unit and supply
-
Image
243
- Installation of a new Sevadis EV Charger with a new dedicated consumer unit and supply
-
Image
244
- Installation of a new Sevadis EV Charger with a new dedicated consumer unit and supply
-
Image
245
- Some Industrial works, Rewiring multiple circuits and working at Heights using Mobile Booms
-
Image
246
- Some Industrial works, Rewiring multiple circuits and working at Heights using Mobile Booms
-
Image
247
- Some Industrial works, Rewiring multiple circuits and working at Heights using Mobile Booms
-
Image
248
- Some Industrial works, Rewiring multiple circuits and working at Heights using Mobile Booms
-
Image
249
- Twin Consumer unit Upgrades for a Domestic Property. Nice clean and tidy installation with one very happy client when we were done
-
Image
250
- Twin Consumer unit Upgrades for a Domestic Property. Nice clean and tidy installation with one very happy client when we were done
-
Image
251
- Twin Consumer unit Upgrades for a Domestic Property. Nice clean and tidy installation with one very happy client when we were done
-
Image
252
- Before and After of a nice and Straight forward Consumer unit upgrade for a Domestic Property
-
Image
253
- Before and After of a nice and Straight forward Consumer unit upgrade for a Domestic Property
-
Image
254
- Before and After of a nice and Straight forward Consumer unit upgrade for a Domestic Property
-
Image
255
- Before and After of a nice and Straight forward Consumer unit upgrade for a Domestic Property
-
Image
256
- Singe Phase Consumer unit upgrade with new Mains isolator and all certification and testing when completed
-
Image
257
- Singe Phase Consumer unit upgrade with new Mains isolator and all certification and testing when completed
-
Image
258
- Singe Phase Consumer unit upgrade with new Mains isolator and all certification and testing when completed
-
Image
259
- Singe Phase Consumer unit upgrade with new Mains isolator and all certification and testing when completed
-
Image
260
- Singe Phase Consumer unit upgrade with new Mains isolator and all certification and testing when completed
-
Image
261
- Battersea Arches, New LED lighting for Displays and Shop areas
-
Image
262
- Battersea Arches, New LED lighting for Displays and Shop areas
-
Image
263
- Battersea Arches, New LED lighting for Displays and Shop areas
-
Image
264
- Battersea Arches, New LED lighting for Displays and Shop areas
-
Image
265
- Battersea Arches, New LED lighting for Displays and Shop areas
-
Image
266
- Office Refurb works, All new containment, Power, Lighting, Data
-
Image
267
- Office Refurb works, All new containment, Power, Lighting, Data
-
Image
268
- Office Refurb works, All new containment, Power, Lighting, Data
-
Image
269
- Office Refurb works, All new containment, Power, Lighting, Data
-
Image
270
- Office Refurb works, All new containment, Power, Lighting, Data
-
Image
271
- Office Refurb works, All new containment, Power, Lighting, Data
-
Image
272
- 3 Phase Distribution board upgrade
-
Image
273
- 3 Phase Distribution board upgrade
-
Image
274
- 3 Phase Distribution board upgrade
-
Image
275
- 3 Phase Distribution board upgrade
-
Image
276
- Maintaining a high standard of work
-
Image
277
- One of many consumer units we have replaced.
-
Image
278
- A recent replacement of a consumer unit with surge protection
London Electrical Solutions Ltd
- Identification checked
- Company address verified
- Customer references checked
- Agreed to TrustATrader's high standards
- Agreed to complaints procedure
Insurance details
Provider | AXA |
---|---|
Verified | 29th October 2024 |
SE10 9QF
Qualifications
- NICEIC
- Alcumus
- Constructionline
Reviews (531)
-
Average rating: 5.0 out of 5
Review by Anne Sophie Petitdemonge
on 8th July 2024
- Initial impression Initial impression: 5 out of 5.0
- Punctuality Punctuality: 5 out of 5.0
- Cleanliness Cleanliness: 5 out of 5.0
- Quality Quality: 5 out of 5.0
- Value Value: 5 out of 5.0
- Overall opinion Overall opinion: 5 out of 5.0
-
Average rating: 5.0 out of 5
Review by Evgenia
on 8th July 2024
- Initial impression Initial impression: 5 out of 5.0
- Punctuality Punctuality: 5 out of 5.0
- Cleanliness Cleanliness: 5 out of 5.0
- Quality Quality: 5 out of 5.0
- Value Value: 5 out of 5.0
- Overall opinion Overall opinion: 5 out of 5.0
-
Average rating: 5.0 out of 5
Review by Julia Nation
on 30th May 2024
"Polite and efficient- thanks very much."
- Initial impression Initial impression: 5 out of 5.0
- Punctuality Punctuality: 5 out of 5.0
- Cleanliness Cleanliness: 5 out of 5.0
- Quality Quality: 5 out of 5.0
- Value Value: 5 out of 5.0
- Overall opinion Overall opinion: 5 out of 5.0
-
Average rating: 5.0 out of 5
Review by Rachel Phillips
on 10th May 2024
"Thanks for providing a great service."
- Initial impression Initial impression: 5 out of 5.0
- Punctuality Punctuality: 5 out of 5.0
- Cleanliness Cleanliness: 5 out of 5.0
- Quality Quality: 5 out of 5.0
- Value Value: 5 out of 5.0
- Overall opinion Overall opinion: 5 out of 5.0